PROCESSING GUIDE FOR APPLICANTS
BUILDING PERMIT
Requirements
| CHECKLIST OF REQUIREMENTS | WHERE TO SECURE |
|---|---|
| 1. Four (4) Sets of Survey plans, Design plans and Specifications-Duly signed and sealed (Architectural, Structural, Electrical, Mechanical, Sanitary, Plumbing, Electronics and Lot Survey) | 1. Private Registered and Licensed Architect, Civil/Structural Engineer, Electrical Engineer, Sanitary Engineer, Master Plumber, Electronics Engineer and Geodetic Engneer |
| 2. Four (4) sets Unified Application Forms for Building Permit (Architectural, Structural, Electrical, Mechanical, Sanitary, Plumbing, Electronics and Lot Survey (Building Permit forms must be duly filled up, signed, sealed and notarized) | 2. Municipal Engineering Office |
| 3. Four (4) sets Building Cost Estimates | 3. Private Registered and Licensed Architect/Civil Engineer |
| 4. Four (4) sets Tehnical Specifications | 4. Private Registered and Licensed Architect/Civil Engineer |
| 5. Two (2) sets Structural design Analysis (except for one storey and single detached building/structure with total floor area of 20sq.m. or less) | 5. Private Registered and Licensed Civil/Structural Engineer |
| 6. Two (2) sets Boring and Load Test for buildings/structures of three (3) storeys and higher | 6. Private Registered and Licensed Structural Engineer |
| 7. Four (4) sets Construction Safety Health Program | 7. Safety Officer |
| *Two (2) sets of certified true copy and two (2) sets of photocopies each document 8.1 TCT (Transfer Certificate of Title) 8.2 Tax Declaration 8.3 Current Tax Receipt/Certificate of Non-tax Deliquency 8.4 A&D Certification from CENRO (for unpatented lands) 8.5 Deed of Sale (if not yet transferred) 8.6 Contract of Lease (in case of Land Lease) 8.7 Certificate of Registration & Board Resolution & Board Resolution Authorization (in case of Corporation/Cooperative) 8.8 Affidavit of Consent of Lot Owner (if the applicant id not registered lot owner) | 8.1 Registry of Deeds 8.2 Municipal Assessors Office 8.3 Municipal Treasury Office 8.4 CENRO 8.5 Owner/Client 8.6 Owner/Client 8.7 Owner/Client 8.8 Owner/Client |
| 9. One (1) set of Locational Clearance/ Zoning Decision | 9. Municipal Planning Development Office |
| 10. Barangay Clearance | 10. BLGU where the building/structure be located |
| 11. One (1) set Fire Safety Clearance | 11. Local Bureau of Fire Protection |
| * One (1) set of original copy and two (2) sets of photocopies 12.1 Road Right-of-Way Clearance 12.2 Waterway Clearance 12.3 Transmission Line Right-of-Way Clearance | 12.1 DPWH-BED/Provincial Engineering Office, as the case may be 12.2 DPWH-BED 12.3 NGCP |
| 13. One (1) set of Photocopy of PTR (Professional Tax Receipt) & Professional Identification Card (PRC ID) of all design professionals | 13. Private Duly Registered and Licensed design professionals |
| 14. One (1) set of Authorization Letter in case owner in not personally applying | 14. Owner/Client |
STEP 1: Submitting of Requirements
Accomplish Building Permit Application Form with Complete Requirements and submit at the Building Official, Municipal Engineering Office, Poblacion, Bokod, Benguet, for evaluation.
STEP 2: Payment
2.1 Proceed to the Municipal Treasury Office for the assessment and payment fees based on National Building Code of the Philippines New Schedule of Fees,
2.1. Make sure to secure an Official Receipt upon payment.
2.1. Make sure to secure an Official Receipt upon payment.
STEP 3: Releasing
Return to the Municipal Engineering Office for the Processing and Releasing of Approved Building Permit.
OCCUPANCY CERTIFICATE
Requirements
| CHECKLIST OF REQUIREMENTS | WHERE TO SECURE |
|---|---|
| 1. Unified Application Form for Certificate of Occupancy | 1. Municipal Engineering Office |
| 2.1Three (3) Copies of duly Notarized Certificate of Completion, signed and sealed by the Licensed Architect or Civil Engineer in-charge of Construction, together with Approved Plan and Specification. | 2.1 Registered and Licensed Architect-in-Charge /Civil Engineer-in-Charge of Consruction |
| 2.2 Construction Logbook | 2.2 Registered and Licensed Architect-in-Charge /Civil Engineer-in-Charge of Consruction |
| 2.3 In case the construction was undertaken through a contract, the certificate of Completion shall be signed by the contractor/Authorized Managing Officer | 2.3 Contractor/Authorized Managing Officer |
| 3. Four (4) sets of the As-Built Plans reflecting all the changes/ modifications/ alterations/ amendments made as additional document, subject to the compliance of the National Building Code and its referral codes, Zoning regulations and Fire Code of the Philippines, in case of changes in the building plans covered by the issued building permit. | 3. Private Registered and Licensed Architect, Civil/Structural Engineer, Electrical Engineer, Sanitary Engineer, Master Plumber, Electronics Engineer and Geodetic Engneer |
| 4. Three(3) Sets of photocopy of PTR (Professional Tax Receipt) & Professional Identification Card (PRC ID) of all design professionals | 4. Private Duly Registered and Licensed design professionals |
| 5. Photograph of the structure with substantial completion showing front, sides, and rear areas. | 5. Owner/Client |
| 6. One (1) set of Fire Safety Compliance and Commissionong Report (FSCCR), if buildings, facilities and structures are required to install any or combination of the following: (1) wet standpipe system; (2)Automatic fire suppression sytem; and (3) Automatic fire detection and alarm system. | 5. Local Bureau of Fire Protection |
STEP 1: Submitting of Requirements
Accomplish Occupancy Application Form with Complete Requirements and submit at the Building Official, Municipal Engineering Office, Poblacion, Bokod, Benguet, for verification and assessment.
STEP 2: Payment
2.1 Proceed to the Municipal Treasury Office for the assessment and payment of fees.
2.2 Make sure to secure an Official Receipt upon payment.
2.2 Make sure to secure an Official Receipt upon payment.
STEP 3: Releasing
Return to the Municipal Engineering Office for the Processing and Releasing of Approved Certificate of Occupancy.